Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the gd-system-plugin domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the purple-xmls-google-product-feed-for-woocommerce domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
ETSU Parking Lot Garage Construction – Janeil Harricharan

ETSU Parking Lot Garage Construction

When leaving a student counseling session one day, I wasn’t in too much of a hurry to get back to where I had parked, which should be the lot seen here. I then realized there was a pretty good view of the superstructure of the parking garage, and decided to get a shot for posterity.

 

That particular month for me was real stressful, so the sight plus the nice weather was welcome.

  • Share on: